Projects

ONGOING PROJECTS

The Peninsula – Plot “C” at Business Bay, Dubai

Project Name : The Peninsula – Plot “C” at Business Bay, Dubai
Client : M/s.Select Global Development Limited on behalf of “Capitol 5 Ltd
Consultant : M/s.BSBG / M/s.Dubai Consultant
Main Contractor : M/s.Al Basti & Muktha LLC
Project Completion : 2nd Quarter of 2026

BUILT UP AREA = 2,255,942 SQ.FT. 

This residential tower is located on Plot No.”C” at Business Bay, Dubai. The project consists of Two Common Basement + Ground Floor + 3 Podiums + 48+R (Two Towers), 1 No. Office Building (G+7+R), 2 Nos. Loft Buildings (G+4), 1 No.F&B Market (G+1).
 
Electrical works consists of complete power distribution from 13 Nos. 1500 KVA & 3 Nos. 1000KVA Transformers & 2 Nos. 2000 KVA Generator set. This includes 3400 meters of bus risers and approx. 104 km. of power cables. Scope of ELV system includes Fire Alarm System (12,300 devices), Central Battery System (6,400 fixtures), Lighting Control System (2070 sensors), Structured Cabling System (8,000 RJ45 points), Security System (1,200 cameras + 255 Nos. Card readers), Video Intercom System (1,037 units). Electrical scope also includes 60,000 Nos. light points. Total connected load is 24 MW. 

Central Air conditioning System consists of supply and installation of Chilled Water Pumps (27 Nos), Chilled Water pipe work system, Duct work, Fan Coil units (2,950 Nos), Heat Exchanger (5 Nos Empower + 8 Nos. Pressure break), FAHUs/AHUs (21Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement level. The total building cooling load is 3,700 TR with cold side temperature of 4.50C (in)/13.50C (out). 

Plumbing, Firefighting and LPG works comprises of drainage system, 90 km. of Cold and Hot water pipe work with 1458 nos Electric Water Heaters in 1009 Apartments + 16 Lofts. Scope of Fire Protection includes automatic sprinklers (22,052 nos) and wet riser fire protection systems, preaction, foam deluge and, gaseous fire suppression systems. LPG works comprises of tie in with infrastructure, PRMS and distribution network to 1009 Apartments + 16 Lofts. LPG works comprises 1000USG (2nos) above ground tanks, Vaporizers, PRMS and distribution network to 1009 Apartments + 16 Lofts. 

Serenia Living, Palm Jumeirah, Dubai

Project Name : Serenia Living, Palm Jumeirah, Dubai
Client : M/s.Serenia Residences Ltd.(Employer Rep. Palma Developments)
Consultant : M/s.Godwin Austen Johnson Architects / Al Hadatha Engineering Consultant
Main Contractor : M/s.Khansaheb Civil Engineering LLC  
Project Completion : 4th Quarter of 2025

BUILT UP AREA = 1,279,181 SQ.FT. 

This residential tower is located on Plot No.PJCRC17B at Palm Jumeirah, Dubai. The project consists of Common Basement + Ground Floor + 4 Residential Buildings (Tower-1 – 17 Levels + Roof, Tower-2 – 19 Levels + Roof, Tower-3 – 14 Levels + Roof, Tower-4 – 12 Levels + Roof).

Electrical works consists of complete power distribution from 6 Nos. 1500 KVA & 1 No. 1000KVA Transformers & 1 No. 2250 KVA Generator set. This includes 520 meters of bus risers and approx. 50 km. of power cables. Scope of ELV system includes Fire Alarm System (7000 devices), Central Battery System (2000 fixtures), Lighting Control System (450 sensors), Structured Cabling System (2800 RJ45 points), Security System (620 cameras + 168 Nos. Card readers), Video Intercom System (226 units), AV/BGM System, Landlord Active Network etc. Electrical scope also includes 48,000 Nos. light points. Total connected load is 11 MW.

Central Air conditioning System consists of supply and installation of Chilled Water Pumps (12 Nos), Chilled Water pipe work system, Duct work, Fan Coil units (1618 Nos), FAHUs/AHUs (11 Nos), Dehumidifier (3 Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement level. The total building cooling load is 2394 TR with cold side temperature of 4.50C (in)/13.50C (out).

Plumbing, Firefighting and LPG works comprises of drainage system, 62km. of Cold and Hot water pipe work with 1015 nos Electric Water Heaters in 226 Apartments. Scope of Fire Protection includes automatic sprinklers (10,115 nos) and wet riser fire protection systems, foam deluge and, gaseous fire suppression systems. LPG works comprises of tie in with infrastructure, PRMS and distribution network to 226 Apartments. LPG works comprises PRMS and distribution network to 226 Apartments.

Arenco Twin Tower, Al Safouh, Dubai 

Project Name :  Arenco Twin Tower, Al Safouh, Dubai
Client : M/s.Arenco Real Estate (Mr.Abdulla Ahmed Almoosa)
Consultant : M/s.Arenco Architectural & Engineering Consultant
Main Contractor : M/s.Al Basti & Muktha LLC
Project Completion : 2nd Quarter of 2027

BUILT UP AREA = 2,388,202 SQ.FT. 

This residential twin tower is located on Plot No.3820126 at Al Safouh, Dubai. The project consists of Two Common Basements + Ground Floor + 6 Podiums + Recreation Floors and 37+R Twin Towers.

Electrical works consists of complete power distribution from 13 Nos. 1500 KVA Transformers & 5 Nos. 1000 KVA Generator set. This includes 3600 meters of bus risers and approx. 56 km. of power cables. Scope of ELV system includes Fire Alarm System (14,200 devices), Central Battery System (6200 fixtures), Lighting Control System (978 sensors), Structured Cabling System (4800 RJ45 points), Security System (1600 cameras + 165 Nos. Card readers), Video Intercom System (364 units) & SMATV System (1600 points). Electrical scope also includes 60,000 Nos. light points. Total connected load is 19.8 MW.

Central Air conditioning System consists of supply and installation of Chilled Water Pumps (9 Nos), Chilled Water pipe work system, Duct work, Fan Coil units (2594 Nos), FAHUs/AHUs (15 Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement level. The total building cooling load is 3550 TR with cold side temperature of 4.50C (in)/13.50C (out). 

Plumbing, Firefighting and LPG works comprises of drainage system, 72km. of Cold and Hot water pipe work with 1980 nos Electric Water Heaters in 364 Apartments and Commercial kitchens and FOH areas. Scope of Fire Protection includes automatic sprinklers (30,095 nos) and wet riser fire protection systems, preaction, foam deluge and, gaseous fire suppression systems. LPG works comprises of tie in with infrastructure, PRMS and distribution network to 364 Apartments & Retails. LPG works comprises 2000USG (1no) above ground tanks, Vaporizers, PRMS and distribution network to 364 Apartments. 

The Peninsula – Plot “F” at Business Bay, Dubai 

Project Name : The Peninsula – Plot “F” at Business Bay, Dubai
Client : M/s.Select Global Development Limited on behalf of “Capitol 5 Ltd
Consultant : M/s.Killa Architectural Design/ Dubai Consultant
Main Contractor : M/s.Al Basti & Muktha LLC
Project Completion : 2nd Quarter of 2026

BUILT UP AREA = 538,796 SQ.FT. 

This residential tower is located on Plot No.”F” at Business Bay, Dubai. The project consists of Two Common Basement + Ground Floor + L1 to L3 (Podium), L4 Pool Deck, L5 Amenities + L6 to L35 Apartment Floors ( L16/L17) MEP Floor + Roof.

Electrical works consists of complete power distribution from 3 Nos. 1500 KVA & 1 No. 1000KVA Transformers & 1 No. 800 KVA Generator set. This includes 420 meters of bus risers and approx. 22 km. of power cables. Scope of ELV system includes Fire Alarm System (2760 devices), Central Battery System (1050 fixtures), Lighting Control System (278 sensors), Structured Cabling System (1260 RJ45 points), Security System (360 cameras + 10 Nos. Card readers), Video Intercom System (82 units). Electrical scope also includes 13,700 Nos. light points. Total connected load is 5.4 MW.

Central Air conditioning System consists of supply and installation of Chilled Water Pumps (7 sets), Chilled Water pipe work system, Duct work, Fan Coil units (656 Nos), Heat Exchanger (2 Nos), FAHUs/AHUs (10 Nos), Dehumidifier (4 Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement level. The total building cooling load is 915 TR with cold side temperature of 4.50C (in)/13.50C (out).

Plumbing, Firefighting and LPG works comprises of drainage system, 17.5km. of Cold and Hot water pipe work with 381 nos Electric Water Heaters in 82 Apartments. Scope of Fire Protection includes automatic sprinklers (5,600 nos) and wet riser fire protection systems, preaction, foam deluge and, gaseous fire suppression systems. LPG works comprises of tie in with infrastructure, PRMS and distribution network to 82 Apartments. LPG works comprises 500USG (1no) above ground tanks, Vaporizers, PRMS and distribution network to 82 Apartments. 

Wasl Tower – High Rise Tower, Sheikh Zayed Road, Dubai

Project Name :  Wasl Tower – Mixed use High Rise Tower, Sheikh Zayed Road, Dubai
Client : M/s.Wasl LLC
Consultant : M/s.Werner Sobek/ Seed Engineering
Main Contractor : M/s.Saleh Constructions LLC
Project Completion : 1st Quarter of 2024

BUILT UP AREA = 1,754,510 SQ.FT. 

This mixed use tower is located at Sheikh Zayed Road (Al Wasl), Dubai. The project comprises of 2 Basements +Ground Floor +64Floor+Roof & G+11+Mech.+Roof Parking, Commercial, Office, Hotel & Residential). 

Electrical works consists of complete power distribution from 15 Nos. 1500 KVA Transformers, 2 Nos. 2000 KVA Generator set and a total of 600 KVA UPS units. This includes approx. 65 km. of power cables. Scope of ELV system includes Fire Alarm & Voice Evacuation System (13,000 devices), Central Battery System (5500 fixtures). Electrical scope also includes 45,000 Nos. light points and supply of all type of FOH, BOH and Landscape light fittings. Total connected load is 22.73 MW. 

Central Air conditioning System consists of supply and installation of Chilled Water pipe work system, Duct work, Fan Coil units (1169 Nos), FAHUs & AHUs (57 Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement-2. The total building cooling load is 4095 TR with cold side temperature of 4.50C (in)/ 13.50C (out).

Services and controls are provided to maintain the internal environment over a wide range of occupancy patterns. The mechanical services are fully automated linked back to centrally monitored PC system. 

Plumbing, Firefighting and SNG works comprises of drainage system, 40km. of cold and hot water pipe work with 502nos electric water heaters in apartments and centralized hot water generation plant comprising Solar panels (90nos), Water to Water Heat Pumps (235kW each), Calorifiers 5000L x 6nos, 4000L x 2nos, 3000L x 2nos & 1500L x 2nos serving  guest rooms, commercial kitchens and FOH areas. Scope of fire protection includes automatic sprinklers (15000nos) and wet riser fire protection systems, pre-action, foam deluge and, gaseous fire suppression systems. SNG works comprises of 2000USG (2nos) above ground tanks, Vaporizers, PRMS and distribution network to apartments. 

The Peninsula – Plot “D” at Business Bay

Project Name : The Peninsula – Plot “D” at Business Bay
Client : M/s.Select Global Development Limited on behalf of “Capitol 5 Ltd
Consultant : M/s.Khatib & Alami
Main Contractor : M/s.Al Basti & Muktha LLC
Project Completion : 4th Quarter of 2024

BUILT UP AREA = 744,143 SQ.FT. 

This residential tower is located on Plot No.”D” at Business Bay, Dubai. The project consists Common Basement + Ground Floor + 36 + Roof & Villa stacked Units (2 buildings consisting of 30 Villas each) GF+5+Tech. Floor + Roof.

Electrical works consists of complete power distribution from 3 Nos. 1500 KVA & 2 Nos. 1000KVA Transformers & 1 No. 1000 KVA Generator set. This includes 400 meters of bus risers and approx. 30 km. of power cables. Scope of ELV system includes Fire Alarm System (3600 devices), Central Battery System (1600 fixtures), Lighting Control System (400 sensors), Structured Cabling System (2500 RJ45 points), Security System (500 cameras + 50 Nos. Card readers), Video Intercom System (437 units). Electrical scope also includes 18,000 Nos. light points. Total connected load is 6.9 MW.

Central Air conditioning System consists of supply and installation of Chilled Water Pumps (4 Nos), Chilled Water pipe work system, Duct work, Fan Coil units (1093 Nos), FAHUs/AHUs (7 Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement level. The total building cooling load is 1410 TR with cold side temperature of 4.50C (in)/13.50C (out). 

Plumbing, Firefighting and LPG works comprises of drainage system, 46km. of Cold and Hot water pipe work with 626 nos Electric Water Heaters in 381 Apartments and Commercial kitchens and FOH areas. Scope of Fire Protection includes automatic sprinklers (6,820 nos) and wet riser fire protection systems, preaction, foam deluge and, gaseous fire suppression systems. LPG works comprises of tie in with infrastructure, PRMS and distribution network to 381 Apartments & Retails. LPG works comprises 1000USG (2no) above ground tanks, Vaporizers, PRMS and distribution network to 381 Apartments. 

Palace Residence on Plot No.Z02.B12, Emaar Beach front - Two Residential Towers.

Project Name : Palace Residence on Plot No.Z02.B12, Emaar Beach front - Two Residential Towers.
Client : M/s.Emaar Development PJSC
Consultant : M/s.Rice Perry Ellis/MEP-GCE
Main Contractor : M/s.Al Basti & Muktha LLC
Project Completion : 2nd Quarter of 2025

BUILT UP AREA = 1,156,748 SQ.FT.

This mixed use tower is located at Sheikh Zayed Road (Al Wasl), Dubai. The project comprises of 2 Basements +Ground Floor +64Floor+Roof & G+11+Mech.+Roof Parking, Commercial, Office, Hotel & Residential).

Electrical works consists of complete power distribution from 15 Nos. 1500 KVA Transformers, 2 Nos. 2000 KVA Generator set and a total of 600 KVA UPS units. This includes approx. 65 km. of power cables. Scope of ELV system includes Fire Alarm & Voice Evacuation System (13,000 devices), Central Battery System (5500 fixtures). Electrical scope also includes 45,000 Nos. light points and supply of all type of FOH, BOH and Landscape light fittings. Total connected load is 22.73 MW.

Central Air conditioning System consists of supply and installation of Chilled Water pipe work system, Duct work, Fan Coil units (1169 Nos), FAHUs & AHUs (57 Nos), Smoke Ventilation System and Building Management System. The cooling requirement is served by Empower District Cooling network facilitated by an energy transfer station at Basement-2. The total building cooling load is 4095 TR with cold side temperature of 4.50C (in)/ 13.50C (out).

Services and controls are provided to maintain the internal environment over a wide range of occupancy patterns. The mechanical services are fully automated linked back to centrally monitored PC system.

Plumbing, Firefighting and SNG works comprises of drainage system, 40km. of cold and hot water pipe work with 502nos electric water heaters in apartments and centralized hot water generation plant comprising Solar panels (90nos), Water to Water Heat Pumps (235kW each), Calorifiers 5000L x 6nos, 4000L x 2nos, 3000L x 2nos & 1500L x 2nos serving guest rooms, commercial kitchens and FOH areas. Scope of fire protection includes automatic sprinklers (15000nos) and wet riser fire protection systems, pre-action, foam deluge and, gaseous fire suppression systems. SNG works comprises of 2000USG (2nos) above ground tanks, Vaporizers, PRMS and distribution network to apartments. 

FEATURED PROPERTIES IN DUBAI

Jumeirah Gate Hotel & Residential Development at Marsa, Dubai
Mashreq Bank Headquarters Tower, Burj Khalifa District, Dubai
The Address Residence – Sky View

Vida Residence – Plot 49 - Downtown Dubai
      Dubai Creek Residence Phase 01A

      R1010 – Jumeirah Beach Resort & Spa (Mandarin)

Burj Vista Tower Downtown Dubai Development

City Walk (Residential Blocks) at Jumeirah

JW Marriott Marquis Hotel

Hyatt Regency Dubai Creek Heights

Grosvenor House –I & II

Address

BILT Middle East LLC
P.O. Box 2393
Dubai, U.A.E

Follow Us
Contacts
  • Email: abmbilt@emirates.net.ae
  • Phone: +971 4 343 9798
  • Fax:     +971 4 343 9445